UL&IPC Standard &ISO
Layer: 2L
PCB Thickness: 1.6mm
PCB Size: 130*75mm
Min Size: 0402
Min Pitch: 0.1mm
Application: Power Electronics
Item | Speci. |
PCB SMT Min thickness | T<0.1mm |
PCB SMT Max thickness | T>4.5mm |
PCB SMT Min Length | L≥3mm, |
PCB SMT Min Width | W≥3mm |
PCB SMT Max Length | L > 1200mm |
PCB SMT Max Width | W> 500mm |
Min panel size | 0.3mm*0.2mm |
Max panel size | 200mm*125mm<SMD |
component thickness | 6.5mm<T≤15mm |
Min pin space | 0.3mm≤Pitch<0.4mm |
Min ball space | 0.3mm≤Pitch<0.5mm |
PCB DIP Min thickness | T<0.8mm |
PCB DIP Max thickness | T>2mm |
PCB DIP Min Length | L≥50mm |
PCB DIP Min Width | W≥30mm |
PCB DIP Max Length | L≥1200mm |
PCB DIP Max Width | W≥500mm |
Inter package | Vacuum/ Antistatic Bag |
Outer package | Carton |
SMT capacity | Four Million point/day |
1. PCB production time: sample: 3-4 days / production: within 7 days
2. Fast pcb delivery: 24 hours for 2L ; 48 hours for 4L ; 72 hours for 6L.
3. Component purchase: 2 days if all components is available in our domestic market.
4. PCB Assembly: samples: within 8 days / mass production: within 12 days
LAYER | PROTOTYPE | MASS PRODUCTION (above 20 m2) | |
Quick Turn | Standard Time | ||
MC PCB | 48 hours | 4-5 days | 10-12 days |
PFC 1 L | 48 hours | 5-6 days | 12-13 days |
1L | 24 hours | 3-4 days | 8-10 days |
2L | 24 hours | 3-4 days | 8-10 days |
4L | 48 hours | 5-6 days | 8-10 days |
6L | 72 hours | 6-7 days | 10-12 days |
8L | 72 hours | 7-8 days | 12-14 days |
10L | 96 hours | 9-10days | 16-18 days |
PCB Prototype | Quick Turn PCB | Single-Sided PCB |
Double-Sided PCB | Multilayer PCB | Rigid PCB |
Flexible PCB | Rigid-Flex PCB | LED PCB |
Aluminum PCB | Metal Core PCB | Thick Copper PCB |
HDI PCB | BGA PCB | High TG PCB |
PCB Stencil | Impedance Control PCB | PCB Assembly |
High-Frequency PCB | Bluetooth Circuit Board | Automotive PCB |
USB Circuit Board | Halogen-Free PCB | Antenna PCB |
SEND MESSAGE
If you are interested in our products and want to know more details,please leave a message here,we will reply
CONTACT US
E-main:admin@bdctl.com
803, Building 38, Tangshuiwei Old Village, Minzhi Street, Longhua District, Shenzhen
PCB Factory: No. 2F to 6F, NO.1 Xingye Road, Xiaolan Town, Zhongshan City, Guangdong Province
The first floor of the above address is SMT processing plant